| Section | Description | Published |
|---|---|---|
| Environmental Statement | Environmental Statement Volume III - Appendices to Chapter 13 Size: 109 MB | 28 December 2011 |
| Environmental Statement | Environmental Statement Supplement and Non-Technical Summary (Document reference 3.5) Size: 34 MB | 28 December 2011 |
| Reports | Report on Natural Features Supplement Size: 32 KB | 28 December 2011 |
| Reports | Report on Effects on European Sites Supplement Size: 28 KB | 28 December 2011 |
| Reports | Consultation Report Supplement Size: 96 KB | 28 December 2011 |
| Additional Information (Reg 6) | Grid Connection Statement Statement of responsibility for grid or pipeline connection Size: 71 KB | 28 December 2011 |
| Application Form | Letter Letter of Application Size: 1 MB | 28 December 2011 |
| Application Form | Application Form Application Form Size: 523 KB | 28 December 2011 |
| Application Form | Copies of newspaper notices Copies of notices placed in the newspaper in accordance with Regulation 4 Applications (Prescribed Forms & Procedure) Regulations 2009 Size: 3 MB | 28 December 2011 |
| Compulsory Acquisition Information | Statement of Reasons Statement of reasons why compulsory purchase powers in draft proposed Order are justified Size: 214 KB | 28 December 2011 |
| Compulsory Acquisition Information | Funding Statement Statement of how claims for compensation in relation will be met Size: 46 KB | 28 December 2011 |
| Compulsory Acquisition Information | Book of Reference parts 1-5 Details of those interests in land over which compulsory purchase powers are sought Size: 449 KB | 28 December 2011 |
| Draft Development Consent Orders | Development Consent Order The draft proposed Order Size: 226 KB | 28 December 2011 |
| Draft Development Consent Orders | Explanatory memorandum Explanatory Memorandum to draft proposed Order Size: 171 KB | 28 December 2011 |
| Environmental Statement | Environmental Statement Volume I - Figures Environmental Statement pursuant to the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 Size: 392 MB | 28 December 2011 |
| Environmental Statement | Environmental Statement Volume II Environmental Statement pursuant to the Infrastructure Planning (Environmental Impact Assessment) Regulations 2010 Size: 479 MB | 28 December 2011 |
| Environmental Statement | Environmental Statement Volume III - Appendices Environmental Statement pursuant to the Infrastructure Planning (Environmental Impact Assessment) Regulations 2011 Size: 54 MB | 28 December 2011 |
| Environmental Statement | Non-technical Summary Non-technical summary pursuant to Schedule 4 of the EIA Regulations Size: 26 MB | 28 December 2011 |
| Environmental Statement | Environmental Statement Volume I Environmental Statement pursuant to the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 Size: 2 MB | 28 December 2011 |
| Other Documents | Health Impact Annex A Overview of the Project's implications for health Size: 5 MB | 28 December 2011 |
| Other Documents | Design and Access Statement Statement in respect of the design and accessibility of the Project according to the requirements of Article 4C of the Town and Country Planning (General Development Procedure) Order 1995 (as amended) Size: 123 MB | 28 December 2011 |
| Other Documents | Combined Heat and Power Report Strategy for development of the Project as a combined heat and power resource Size: 8 MB | 28 December 2011 |
| Other Documents | WRATE, Carbon and Efficiencies of Scale Report Report on the Waste Resources Assessment Tool for the Environment, carbon and environmental efficien Size: 1 MB | 28 December 2011 |
| Other Documents | Heads of Terms Draft Heads of Terms of proposed development consent obligation between the Applicant and relevant local authorities Size: 60 KB | 28 December 2011 |
| Other Documents | Planning Statement Statement of the relevant policy (national and local) and other factors relating to planning matters in support of the Project Size: 9 MB | 28 December 2011 |
| Other Documents | Alternative Site Assessment Report Assessment of alternative sites for the purposes of the Project Size: 8 MB | 28 December 2011 |
| Other Documents | Need Assessment Assessment of the need for the Poject Size: 1 MB | 28 December 2011 |
| Other Documents | Economic Statement Statement of the economic viability of the Project Size: 162 KB | 28 December 2011 |
| Other Documents | Health Impact Assessment Overview of the Project's implications for health Size: 2 MB | 28 December 2011 |
| Other Documents | Design and Access Statement Drawings Statement in respect of the design and accessibility of the Project according to the requirements of Article 4C of the Town and Country Planning (General Development Procedure) Order 1995 (as amended) Size: 91 MB | 28 December 2011 |
| Other Documents | Engineering Design Statement Statement on aspects of the engineering design of the Project Size: 1 MB | 28 December 2011 |
| Other Documents | Rail Feasibility Report Report on the feasibilty of serving the Project Size: 9 MB | 28 December 2011 |
| Other Documents | Transport Assessment 1-17 Asseessment of the transport matters relating to the Project Size: 51 MB | 28 December 2011 |
| Other Documents | Transport Assessment 18-35 Asseessment of the transport matters relating to the Project Size: 16 MB | 28 December 2011 |
| Other Documents | Travel Plan "Proposed travel plan in respect of travel matters relating to staff at the RRF Size: 8 MB | 28 December 2011 |
| Other Documents | Sustainability Assessment Assessment of the sustainability of the Project Size: 381 KB | 28 December 2011 |
| Other Documents | WRATE, Carbon and Efficiencies of Scale Report - Annex A Report on the Waste Resources Assessment Tool for the Environment, carbon and environmental efficien Size: 94 KB | 28 December 2011 |
| Other Documents | Need Assessment - Annex A Need Assessment - Annex A Size: 511 KB | 28 December 2011 |
| Plans | Works Plans - Key Plan Work Plans - Key Plans Size: 1 MB | 28 December 2011 |
| Plans | Application Site Plan Order Limits Plan Application Site Plan/Order Limits Plan Size: 2 MB | 28 December 2011 |
| Plans | RRF Site Section RRF Site Sections Size: 961 KB | 28 December 2011 |
| Plans | RRF Roof Plan RRF Roof Plans Size: 1 MB | 28 December 2011 |
| Plans | Proposed access road with proposed 2.5m footpath at level crossing Proposed access road Proposed 2.5m footpath at level crossing Size: 3 MB | 28 December 2011 |
| Plans | Land Plan Land Plan Size: 2 MB | 28 December 2011 |
| Plans | Rights of Way Plan Rights of Way Plan Size: 2 MB | 28 December 2011 |
| Plans | EfW Facility South Elevation EfW Facility South Elevation Size: 1 MB | 28 December 2011 |
| Plans | EfW Facility North Elevation EfW Facility North Elevation Size: 1 MB | 28 December 2011 |
| Plans | EfW Facility East Elevation EfW Facility East Elevation Size: 1006 KB | 28 December 2011 |
| Plans | EfW Facility West Elevation EfW Facility West Elevation Size: 1 MB | 28 December 2011 |
| Plans | EfW Facility East Sectional Elevation EfW Facility East Sectional Elevation Size: 734 KB | 28 December 2011 |
| Plans | EfW Facility West Sectional Elevation EfW Facility West Sectional Elevation Size: 836 KB | 28 December 2011 |
| Plans | RRF Tertiary Building Elevations RRF Tertiary Building Elevations Size: 993 KB | 28 December 2011 |
| Plans | RRF North and South Elevations RRF North and South Elevations Size: 2 MB | 28 December 2011 |
| Plans | RRF East and West Elevations RRF East and West Elevations Size: 2 MB | 28 December 2011 |
| Plans | RRF Boundary Details RRF Boundary Details Size: 847 KB | 28 December 2011 |
| Plans | Proposed Access road existing footpath width at level crossing Proposed Access road existing footpath width at level crossing Size: 3 MB | 28 December 2011 |
| Plans | Proposed access to The Rookery Resource Facility Proposed cross section Proposed access to The Rookery Resource Facility Proposed cross section Size: 1 MB | 28 December 2011 |
| Plans | Level Crossing Level Crossing Size: 2 MB | 28 December 2011 |
| Plans | Landscape Strategy Landscape Strategy Size: 4 MB | 28 December 2011 |
| Plans | Planting Strategy - Wider Site Planting Strategy - Wider Site Size: 2 MB | 28 December 2011 |
| Plans | Secondary Buildings Elevations - MRF Size: 1 MB | 28 December 2011 |
| Plans | Lighting Layout and Strategy Operational Area Lighting Layout & Strategy Operational Area Size: 3 MB | 28 December 2011 |
| Plans | Operational Area Masterplan and Green Lane Country Park and RRF Entrance Operational Area Masterplan & Green Lane Country Park & RRF Entrance Size: 66 MB | 28 December 2011 |
| Plans | Planting Strategy - Operations Area and Green Lane Country Park and RRF Entrance Planting Strategy - Operations Area and Green Lane Country Park & RRF Entrance Size: 3 MB | 28 December 2011 |
| Plans | Trees to be removed retained Trees to be removed/retained Size: 5 MB | 28 December 2011 |
| Plans | Works Plans - 1 of 2 Work Plans - 1 of 2 Size: 438 KB | 28 December 2011 |
| Plans | Works Plans - 2 of 2 Work Plans - 2 of 2 Size: 1 MB | 28 December 2011 |
| Plans | Land Plan Extinguishment of Rights - Key Plan Land Plan: Extinguishment of Rights - Key Plan Size: 5 MB | 28 December 2011 |
| Plans | Land Plan Extinguishment of Rights - 1 of 4 Land Plan: Extinguishment of Rights - 1 of 4 Size: 2 MB | 28 December 2011 |
| Plans | Land Plan Extinguishment of Rights - 2 of 4 Land Plan: Extinguishment of Rights - 2 of 4 Size: 2 MB | 28 December 2011 |
| Plans | Land Plan Extinguishment of Rights - 3 of 4 Land Plan: Extinguishment of Rights - 3 of 4 Size: 2 MB | 28 December 2011 |
| Plans | Land Plan Extinguishment of Rights - 4 of 4 Land Plan: Extinguishment of Rights - 4 of 4 Size: 2 MB | 28 December 2011 |
| Reports | Statement of Engagement Statement pursuant to s79(1) Environmental Protection Act Size: 49 KB | 28 December 2011 |
| Reports | Consultation Report Report produced in accordance with section 37(3)(c) of the Planning Act 2008 Size: 2 MB | 28 December 2011 |
| Reports | Consultation Report - Appendices Report produced in accordance with section 37(3)(c) of the Planning Act 2008 Size: 122 MB | 28 December 2011 |
| Reports | Report on Natural Features Report explaining the inapplicability of Regulation 5(2)(l) Size: 560 KB | 28 December 2011 |
| Reports | Report as to effects on European Sites Report explanation not applicable Size: 395 KB | 28 December 2011 |
| Reports | Historic Environment Report Report explaining the inapplicability of Regulation 5(2)(m) Size: 202 KB | 28 December 2011 |
| Reports | Flood Risk Assessment Report assessing flood risks associated with the Project Size: 59 MB | 28 December 2011 |
| Reports | Flood Risk Assessment - Appendices Report assessing flood risks associated with the Project Size: 388 KB | 28 December 2011 |
Rookery South Energy from Waste Generating Station
The documents on this page are those that have been submitted by the applicant.