| Section | Description | Details |
|---|---|---|
| Correspondence | 110513 WW010001 558588 IPC Section 51 Advice re TW Scoping Report.docIPC S51 Advice re Thames Water EIA Scoping Report for Thames Tunnel project. | Size: 456 KB, Pages: 74 Page size: A4 |
| Correspondence | 130510 WW010001 608594 Covering letter to s51 report.docCovering letter to IPC S51 Advice re Thames Tunnel Scoping Report | Size: 25 KB, Pages: 1 Page size: A4 |
| Meetings | 110414 WW010001 Meeting Note re s51 advice on TW Scoping ReportAdvice given by the IPC to Thames Water regarding the Thames Tunnel Scoping Report. | Size: 256 KB |
| Meetings | 110921 WW010001 Thames Water CEO Meeting noteNote of meeting between Sir Michael Pitt - Chair of the IPC and Martin Baggs - Thames Water CEO | Size: 192 KB |
| Correspondence | 110129 WW010001 reply to clare gibbons FINAL | Size: 29 KB, Pages: 2 Page size: A4 |
| Correspondence | 101115 WW010001 letter to TW FINAL | Size: 26 KB, Pages: 2 Page size: A4 |
Thames Tunnel
The project folder includes any documents which relate to the project excluding the application documents.